Purpose
The following procedures verify the customer defined alarms and relay
contacts are functioning properly. These tests are performed on all AMR
alarms/relays in a sequential manner until all have been verified. Perform
these procedures periodically to ensure the external alarms are reported
properly. Following these procedures ensures continued peak system
performance.
Study the site engineering documents and perform the following tests
only after first verifying that the AMR cabling configuration required to
interconnect the BTS frame with external alarm sensors and/or relays
meet requirements called out in the 1X SC 4812T-MC BTS Hardware
Installation .
Motorola highly recommends that you read and understand
this procedure in its entirety before starting this procedure.
NOTE
Test Equipment
The following test equipment is required to perform these tests:
S LMF
S Alarms Test Box (CGDSCMIS00014) –optional