User's Manual
Site Cabling for BTS With Customer–Supplied Site I/O Interface – continued
JAN 2002
4-9
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
DRAFT
Figure 4-4: Site Cabling for Four MicroCells
MICROCELL 4
MICROCELL 1
MICROCELL 3
CUSTOMER
INPUTS
SPAN
RGPS
SITE I/O
INTERFACE
PHONE
(MODEM)
LA
LA
DSU
LA
MICROCELL 2
ANT 4
TX/RX
LA
GROUND
DC POWER
ANT 3
TX/RX
LA
DC POWER
GROUND
ANT 2
TX/RX
LA
DC POWER
GROUND
ANT 1
TX/RX
LA
DC POWER
GROUND
KEY
B/1(ANTENNA)
LABEL
NUMBER
OF CABLES
NAME
Y/1(GROUND)
Y/1(GROUND)
Y/1(GROUND)
Y/1(GROUND)
D/1(ANTENNA)
D/1(ANTENNA)
D/1(ANTENNA)
D/1(ANTENNA)
U/1(DC POWER)
U/1(DC POWER)
U/1(DC POWER)
U/1(DC POWER)
LEGEND
LA
= Lightning Arrestor
G/1 (MIB) OR
J/1 (MIB)
M/1 (RGPS)
W/1 (SPAN)
O/1 (CUSTOMER
INPUTS)
V/1 (PHONE)
Z/1 (SITE I/O
CABLE) SEE
NOTE
B/1
(GROUND)
NOTES
1: Site I/O junction box and associated cable are
present on MicroCell 1 only.
2. If BTS is not equipped with the primary surge
suppressor, then you will require the Site I/O Cable
Extender Cable, p/n 3088116C01 (cable Z).
3. The AC Installation Box is required for outdoor
applications.
AC POWER
LA
S/1
(AC POWER)
AC INSTALL
BOX
(SEE NOTE 3)
AC POWER
LA
S/1
(AC POWER)
AC INSTALL
BOX
(SEE NOTE 3)
AC POWER
LA
S/1
(AC POWER)
AC INSTALL
BOX
(SEE NOTE 3)
AC POWER
LA
S/1
(AC POWER)
AC INSTALL
BOX
(SEE NOTE 3)
F/1 (MIB) OR
I/1 (MIB)
E/1 (MIB) OR
K/1 (MIB) OR
E/1 (MIB) OR
K/1 (MIB) OR
P/1 (SU)
P/1 (SU)
P/1 (SU)
P/1 (SU)
4