User's Manual

Unit Installation Overview
JAN 2002
6-1
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
DRAFT
Overview
This chapter provides the procedures for unit installation and cabling.
The site cabling has been installed and routed to the location of the BTS.
In this chapter, the cables will be attached to the unit(s). Cabling
installation will be repeated as necessary for each unit at the BTS.
This chapter provides the information and procedures to:
Attach the unit to the mounting bracket
Attach cables to the unit
Power on the unit
Mount the solar covers
Complete the installation completion checklist
Unit Installation Procedure
Order
The process of installing the unit requires that the following procedures
be completed in the order shown:
1. Install back fin cover to unit (required for indoor applications if solar
covers will not be used).
2. Attaching the installation handles to the unit (optional).
3. Attaching the unit to the mounting bracket.
4. Remove the installation handles (optional).
5. Attach earth ground cable and optional master ground cable.
6. Attach the Site I/O junction box to the unit.
7. Attach Subscriber Unit (SU) to unit.
8. Attach front fin cover (required for indoor applications if solar
covers will not be used).
9. Attach the short duration battery (optional).
10. Attach the AC input power or DC input power cable.
11. Attach antenna cable(s).
12. Attach the MIB cables (optional).
13. Attach the SU cables (optional).
14. Terminating unused connectors.
15. Powering on the unit.
16. Attach front solar cover (required for outdoor installations and
optional for indoor applications if fin covers will not be used).
17. Cleaning up site.
18. Filling out the installation completion checklist.
6