Prepare to Leave the Site
JAN 2002
7-91
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
DRAFT
Remove External Test
Equipment
Perform the procedure in Table 7-51 to disconnect the test equipment
and prepare the BTS for active service.
Table 7-51: Remove External Test Equipment
Step Action
1 Disconnect all test equipment from the antenna connectors on the BTS.
2 Reconnect and visually inspect all antenna feed lines on the BTS.
3 Disconnect all test equipment from the diagnostic access area.
Reset and Initialize Site
Remotely
The BTS should not be left with data and code loaded from the CDMA
LMF. The configuration data and code loads used for normal operation
could be different from those stored in the CDMA LMF files. By
resetting the BTS, the required data and code can be loaded from the
CBSC when spans are again active.
To reset the BTS and have the OMCR/CBSC bring up the site remotely,
perform the procedure in Table 7-52.
Table 7-52: Reset BTS and Remote Site Initialization
Step Action
1 Terminate the CDMA LMF session by following the procedures in Table 7-54.
2 Use the AC and DC power breakers to cycle BTS power off and on.
3 Notify the OMCR/CBSC to take control of the site and download code and data to the BTS.
4 Verify the CBSC can communicate with the MAWI.
Bring BTS into Service with the
CDMA LMF
Whenever possible, have the OMCR/CBSC enable the
BTS.
IMPORTANT
*
If code and/or data could not be loaded remotely from the
OMCR/CBSC, follow the steps outlined in Table 7-53 as required to
bring the BTS from the OOS to INS mode.
7