User's Manual

TX Acceptance Tests
DRAFT
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
7-78
Objective
Refer to Table 7-45 to perform a TX ATP test. This procedure assumes
that the site specific CDF file is in the wlmf\cdma\bts# folder.
The ALL TX list performs the following ATP tests:
1. TX Mask
2. Rho
3. Pilot Time Offset
4. Code Domain Power
Prerequisites
You must successfully complete all the procedures outlined in previous
chapters before you attempt to run an ATP.
Procedure to Run TX ATP Test
Table 7-45: Procedure to Run TX ATP Test
Step Action
1 Set up test equipment for TX tests per Figure 7-32 or Figure 7-33.
2 Perform the following to run TX Acceptance Tests:
Select the MAWI.
Click on the Tests menu
Select ALL TX.
* IMPORTANT
The DPLL must be tracking either GPS or HSO.
Procedure to Run TX Tests
Using Backup Synchronization
(Sites Equipped With GPS)
Follow the steps in Table 7-46 to perform the TX test using backup
synchronization.
Table 7-46: Procedure to Run TX Test Using Backup Synchronization
Step Action
1 If logged into the BTS with the LMF, disable the MAWI and logout. Enter the sndtype 0x4003
command to change the state to OOS_RAM.
2 Open an MMI Communication session.
3 Enter the status command to verify that the BTS is in OOS_RAM status.
4 Enter the sndtype 0xa178 command to simulate an LMF connection.
. . . continued on next page