User's Manual
Shut Down & Restore BTS Signaling – continued
DRAFT
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
8-10
Restore Signaling Operations
Follow the steps in Table 8-3 to restore signaling operations to the site.
Table 8-3: Procedure to Restore Signaling Operations
Step Action
1 Open a CLI window. Refer to Table 8-1.
2 Enable the BTS by entering the following command at the prompt:
omc–000000>enable bts–<bts#> unc
3 Enable the MAWI by entering the following command at the prompt:
omc–000000>enable mawi–<bts#> unc
4 View the status of the sector signaling redirect parameters for all carriers equipped for the sector
by entering the following command at the prompt:
omc–000000>display sector–<bts#>–<sector#> redirect
Observe that the values in the system display response should match the values input in step 3 of
the shut down signaling functions table.
Access Overload Class Redirect Flags ROTATE
CARRIER ID RETURN 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 TIMER RECORD EXP IGNORE SYS
(bts–sector–carrier) IF FAIL 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 (SEC) TYPE SID CDMA ORDERING
–––––––––––––––––––– ––––––– – – – – – – – – – – – – – – – – ––––– –––– ––– –––– ––––––––
CARRIER–1–1–1 N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y 4 4 13 Y CUSTOM
. . . continued on next page
8