User's Manual

Shut Down & Restoring BTS Signaling
JAN 2002
8-3
SC300 1X BTS Hardware Installation, ATP, and FRU Procedures
DRAFT
Objective
The FRU procedures require the shut down of BTS signalling functions.
Accessing the OMCR CLI
window
The commands to manipulate the BTS in the following replacement
procedure must be entered via UNO or OMCR (Operations and
Maintenance Center Radio).
Should there be any issues which affect CLI operations or
the UNO/OMCR, this replacement procedure cannot be
performed.
IMPORTANT
*
Accessing the OMCR CLI window
The commands used in the following replacement procedure in Table 8-1
are entered at the OMCR.
Table 8-1: Procedure to Login and Access Alarm Window
Step Action
1 Login by entering the user name.
2 Enter the password at the system prompt.
3 Open an Alarm Manager window and an OMCR CLI window from the pull down menu using the
mouse button.
4 Verify that the filter display is set to ALL. This is so that any alarms which may be encountered
while installing the hardware can be observed and rectified.
Shut Down Signaling Functions
Table 8-2 contains steps for shutting down the signaling functions for the
sector/site.
The BTS acts like a single sector and all sector commands
operate on the BTS carrier.
NOTE
8