Service Manual
GSM-205-523
Routine maintenance overview
31st Oct 01
Maint. 1–2
Maintenance Information: Horizon
macro
indoor
CONTROLLED INTRODUCTION
68P02902W09-B
Routine
maintenance
intervals
Routine maintenance for Horizon
macro
indoor installations is recommended at
the intervals shown in Table 1-1:
Table 1-1 Routine maintenance schedule
6 months 12 months 24 months
Ensure that cabinet
air inlets, exhaust
grilles and filter (if
fitted) are not
blocked.
Annual check of the
installation.
Inspect general
mechanical condition of
the cabinet.
Check normal operation,
including fans. Also cable
integrity and state of all
connections.
Inspect locks, handles,
and hinges of door.
Lubricate if required.
These procedures are described in subsequent sections of this chapter, one to
cover 6 monthly, one 12 monthly, and one 24 monthly.
Cleaning agents
The following is a list of cleaning and lubricant materials required for routine
maintenance:
Dustpan
Soft brush
Vacuum cleaner.
Mild detergent
De-ionized water.
Soft cloth.
Lubricant (WD40 or equivalent).
Light grease (TBI or equivalent).
Tools
The only tools required are torque spanners, torque wrenches, and torxdrivers,
as listed in
Installation and Configuration: GSM-205-423
Horizon
macro
indoor
tool kit.