Service Manual

GSM-205-423
Decommissioning Horizonmacro indoor
31st Oct 01
Installation & Configuration: Horizon
macro
indoor
68P02902W08-B
CONTROLLED INTRODUCTION
Inst. 5–9
Horizon
macro
indoor
decommission
checklist
Copy this sheet and fill in the checklist in Table 5-1.
NAME_______________________________________DA TE_________
SIGNATURE _________________________________
SITE NAME __________________________________
EQUIPMENT TYPE ____________________________
NATIONAL ID ____________________________
Table 5-1 Checklist of completed decommissioning steps
ACTION Yes No N/A
Horizon
macro
Indoor cabinet taken out of service by
the OMC-R
Packing material (including polythene bag) on site
Is cabinet damaged? If yes, detail in comments box
Hood (if fitted) removed and packed
Power cable disconnected
Interface panel cables disconnected
RF cables disconnected
Extension cabinet fibre optic cables disconnected
Earth cable disconnected
CCBs (if fitted) removed and packed
Stacking bracket (if fitted) removed and packed
Cabinet removed from plinth and packed
Plinth removed from floor and packed
All loose cables stowed and secured
COMMENTS