Service Manual
GSM-205-423
Decommissioning Horizonmacro indoor
31st Oct 01
Inst. 5–4
Installation & Configuration: Horizon
macro
indoor
CONTROLLED INTRODUCTION
68P02902W08-B
Removing
upper cabinet in
stacked
configuration
WARNING Check that the bottom cabinet is bolted to the floor using
the supplied plinth. IF NOT, this presents a danger of
toppling that the decommissioning personnel must take
into account.
To remove the upper cabinet in a stacked configuration:
1. If CCBs are fitted to upper cabinet, remove as described in Removing
CCBs in this section.
2. If stacking bracket is fitted to upper cabinet, remove as described in
Removing a stacking bracket in this section.
WARNING
The cabinet can weigh up to 130 kg if fully equipped.
Handle each cabinet with extreme caution and in
accordance with local health and safety regulations.
Eyebolts are to be used with lifting equipment, and these
must be located in the correct position as shown in
Figure 5-1. The four screw locations used for hood pins
must NOT be used for eyebolts.
Before attempting to insert the eyebolts, visually check
each one for damage. If any damage is apparent, DO
NOT USE.
The eyebolts must not be over tightened; hand tight is
sufficient. Do not tighten eyebolts with a t-bar or
spanner. Screw the eyebolt fully into the lifting point so
that no thread is left exposed.
3. Fit eyebolts to the locations, identified with an eyebolt symbol and the
word LIFT. Attach eyebolts to suitable lifting equipment.
4. Remove the four bolts holding upper cabinet plinth to stacking bracket.
5. Lift upper cabinet, complete with plinth, off stacking bracket, and lower to
floor.
6. Remove the two M10 bolts securing plinth to cabinet, and slide apart.
7. Pack upper cabinet and plinth in separate containers, for storage,
transport or safe disposal.