Service Manual

GSM-205-423
Pre-power up checks
31st Oct 01
Inst. 4–4
Installation & Configuration: Horizon
macro
indoor
CONTROLLED INTRODUCTION
68P02902W08-B
Visual
inspection
Inspect the installation for damage in accordance with BS 7671 (16th Edition
<Section 712>) or the IEC 364 equivalent.
WARNING
If damage is discovered during the visual inspection, the
commissioning must not proceed further until the damage
has been inspected and rectified by the manufacturers or
their representatives.
Cabinet exterior
Examine the exterior of the cabinets for structural, paint or mechanical damage
and report any damage to Motorola.
Cabinet interior
Examine the interior of the cabinet for structural, paint or mechanical damage
and report any damage to Motorola.
Power equipment
Examine the power equipment for mechanical damage and report any damage
to Motorola.
Request for
power supply
connection
Ensure that all correct Request for connection and Completion and
inspection form certificates have been sent to the local electricity supplier.
NOTE
Samples of a typical Request for connection and a
Completion and inspection form are shown in Sample
form 1 and Sample form 2 at the end of this chapter.