Service Manual
GSM-205-423
Commissioning overview and test equipment
31st Oct 01
Installation & Configuration: Horizon
macro
indoor
68P02902W08-B
CONTROLLED INTRODUCTION
Inst. 4–1
Commissioning overview and test equipment
Overview of
commissioning
This chapter provides information required for the commissioning of cabinets
and their internal and external interfaces.
NOTE
Some equipment at the site may not be produced by
Motorola, including battery chargers, power supplies, and
antennas. Refer to site-specific documentation and the
non-Motorola vendor instructions.
All site preparation and equipment installation in the previous chapters must be
completed before commissioning. Commissioning consists of the following:
Pre-power up checks.
Powering up the cabinet.
Optimization procedures as detailed in
Installation and Configuration: BSS
Optimization (GSM-100-423)
.
PC to MCUF
cable pin
connections
Figure 4-1 shows the pin connections for the PC to MCUF test cable. These are
standard null modem pin connections. There is also a TTY adapter, to attach to
the cable, for CTU use, Motorola part number 58C86540N01.
Figure 4-1 9-way to 9-way PC to MCUF cable pin connections