68P02902W08-B
Recommended
bolt length for
concrete floor
The recommended length of the M12 steel anchor bolts is 105 mm minimum.
This is to ensure adequate strength if stacked cabinets are installed.
Installing the
plinth
If the cabinet is a direct replacement for existing Motorola M-Cell
6
, BTS4 or
BTS6 units, the cabinet can be mounted in place using the existing fixing holes.
Only use existing holes if sufficient space exists for the new configuration (see
Site requirements and considerations
).
If the installation is new, the concrete floor must be drilled to accept M12 anchor
bolts. Washers and bushes are supplied, but the M12 steel bolts are supplied
by the customer.
1. Move the cabinet plinth to the selected mounting position. Consider future
as well as present space requirements (see Site requirements and
considerations
).
2. Mark the positions of the four mounting holes in the base of the plinth.
These are in the form of four square holes in the middle of the plinth.
3. Move the plinth well away from the mounting position.
WARNING
Wear safety glasses and a dust mask when drilling holes.
CAUTION Drilling concrete flooring produces cement dust, which is
harmful to equipment and wiring. Protect the cabinets and
any nearby equipment from dust. Use a tarpaulin, cloth, or
plastic sheeting to cover exposed equipment. Clean up
any accumulated debris from the anchor installation
carefully before exposing the equipment. Use drilling
equipment suitable for cutting steel reinforced concrete.
4. Drill out the four holes to a depth and clearance for an M12 anchor bolt,
using the plinth as a template.
5. Fit the M12 mounting anchors to the holes in the floor.
6. Position the plinth over the mounting anchor holes.
7. Fit the anchor bolts with the supplied bushes and washers, through the
plinth floor, to each anchor.
8. Tension up the anchor bolts and then check for alignment and level using
a spirit level.
9. When satisfied that the plinth is correctly aligned, torque the bolts to the
correct value for M12 bolts (see Site requirements and considerations
in this chapter).