Equipment delivery and unpacking
31st Oct 01
Inst. 2–4
Installation & Configuration: Horizon
macro
indoor
CONTROLLED INTRODUCTION
68P02902W08-B
Equipment delivery and unpacking
Delivery and
packaging
overview
Before the cabinet equipment arrives, installation personnel should designate
an area at the site where the equipment can be unloaded. This area should also
be suitable for unpacking the equipment. Consult with the heavy freight or
moving company and the owners of the building (if applicable) to select this
area.
CAUTION
The cabinet equipment should be delivered to the site
while still contained in its packaging. This is to protect the
cabinet in transit and from moisture.
The equipment should be carefully delivered to the site by the freight company,
along with the necessary moving dollies and padding. Use the dollies and
padding to move the equipment from the unloading area to the installation point.
NOTE
Keep all paperwork attached to packaging, or found inside
cabinet.
Packaging crate
The cabinet equipment is shipped in a crate of a similar construction to that
shown in Figure 2-2.
Figure 2-2 Typical shipping crate detail