Service Manual
GSM-205-423
Installation overview
31st Oct 01
Inst. 2–2
Installation & Configuration: Horizon
macro
indoor
CONTROLLED INTRODUCTION
68P02902W08-B
Installation
sections
Installing cabinets comprises the sections shown in Table 2-1.
Table 2-1 Installation sections in this chapter
Section Description
Equipment delivery
and unpacking
Information on delivery packaging, and how
to unpack the equipment.
Installing cabinet
plinth
Details the procedure for fitting the cabinet
plinth base.
Fitting cabinet to
plinth
Provides procedure for attaching cabinet to
prepared plinth.
Hood or stacking
bracket fit
Provides procedure for attaching stacking
bracket on top of any cabinet.
Fitting cabinet onto
stacking bracket
Provides procedure for attaching second
cabinet to stacking bracket of first cabinet.
Installing CCBs into
stacking bracket
Provides procedure for installing CCBs into
stacking bracket of any cabinet.
Earthing and transient
protection
Details site earthing procedures and cabinet
internal earths.
Connecting antennas
and cabinet
configurations
Details setting up antenna connections, with
additional configuration information to
illustrate potential equipment connections.
Interface cabling Details cabling to the interface panel.
Installing power and
earth cabling
Details of power supply earthing
requirements.
Connecting input
power
Details the correct sequence for power
connection.