Service Manual
GSM-205-423
Site requirements and considerations
31st Oct 01
Installation & Configuration: Horizon
macro
indoor
68P02902W08-B
CONTROLLED INTRODUCTION
Inst. 1–7
Site requirements and considerations
Overview of
requirements
The base site area, where the equipment is to be installed, must meet :
Structural requirements including:
– Space for all conditions, including maintenance, expansion and
associated cables.
– Allowance for cabinet height. including allowance for second cabinet
placed on top with stacking bracket.
– Allowanance for weight, including that for potential additions on
expansion.
– Additional space to allow door to be opened beyond 90 degrees.
Environmental and power requirements, as defined in manual
specifications.
Indoor cabinet
dimensions
The dimensions of cabinets are listed in Table 1-3.
Table 1-3 Cabinet dimensions
Cabinet type Height Width Depth
Cabinet (without hood) 750 mm 700 mm 430 mm
Cabinet with optional hood 870 mm 700 mm 430 mm
Cabinet with stacking bracket (to hold CCB) 1025 mm 700 mm 430 mm
Two cabinets, with stacking bracket
between, and optional hood on top
1900 mm 700 mm 430 mm
Two cabinets, with stacking bracket
between, and stacking bracket on top.
2050 mm 700 mm 430 mm
The optional hood allows cables to enter the cabinet from the back and above.
The stacking bracket allows a second cabinet to be stacked on top of the first
cabinet. The stacking bracket can also contain a metal basket, in which CCBs
are fitted (the only Tx unit that cannot fit in the cabinet itself).