Service Manual

GSM-204-423
Site requirements and considerations
31st Oct 01
Inst. 2–2
Installation & Configuration: Horizon
macro
outdoor
CONTROLLED INTRODUCTION
68P02902W03-A
Site requirements and considerations
Overview of
requirements
The base site area, where the equipment is to be installed, must meet:
Structural requirements including:
Space for all conditions, including maintenance, expansion and
associated cables.
Allowance for cabinet height.
Allowance for weight, including that for potential additions on
expansion.
Additional space to allow doors to be fully opened to 120 degrees.
Environmental and power requirements, as defined in manual
specifications.
Outdoor cabinet
dimensions
The dimensions of cabinets are shown in Table 2-2.
Table 2-2 Cabinet dimensions
Cabinet type Height Width Depth
Horizon
macro
outdoor cabinet 1364 mm 1300 mm 594 mm
Horizon
macro
auxiliary equipment housing 1364 mm 604mm 594 mm
Cabinet weights
The cabinet weights are shown in Table 2-3.
Table 2-3 Outdoor cabinet weights
BTS cabinet with six transceivers Auxiliary equipment housing empty
/ 16 batteries fitted
360 kg 110 kg / 500 kg
Torque values
Use the torque values listed in Table 2-4 during installation (see NOTE for M12).
Table 2-4 Torque values for all cabinet screws/bolts or RF connectors
Screw/bolt size M4 M6 M8 M10 SMA N-type 7/16
Torque value (Nm) 2.2 3.4 5 10 1 3.4 25
NOTE The setting of torque value for M12 anchor screws/bolts
depends on local supplies. Refer to the manufacturer’s
data for correct values.