Service Manual

GSM-204-020
31st Oct 01
Service Manual: Horizon
macro
outdoor
68P02902W12-A
CONTROLLED INTRODUCTION
xiii
Connecting fibre optic cables Inst. 3–57. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Location of fibre optic connections Inst. 3–57. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Care of fibres Inst. 3–57. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Connecting fibre optic cables between cabinets Inst. 3–60. . . . . . . . . . . . . . . . . . . . .
Interface panel cabling Inst. 3–61. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Interface panel diagram and pinout overview Inst. 3–61. . . . . . . . . . . . . . . . . . . . . .
Interface panel connector pinout tables Inst. 3–62. . . . . . . . . . . . . . . . . . . . . . . . . . . .
GPS connector Inst. 3–62. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
RTC connector (not used) Inst. 3–63. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
BIB (BIM) interconnection Inst. 3–64. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
T43 (CIM) interconnection Inst. 3–65. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PIX inputs and outputs Inst. 3–66. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ICS connector Inst. 3–67. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
External alarm connector Inst. 3–68. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Chapter 4
Installing the cable shroud i. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Introduction to cable shroud installation Inst. 4–1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Preparing to install the cable shroud Inst. 4–1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Considerations when installing the cable shroud Inst. 4–1. . . . . . . . . . . . . . . . . . . .
Cable shroud installation procedures Inst. 4–2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Attaching the cable shroud frame to the BTS cabinet Inst. 4–2. . . . . . . . . . . . . . . .
Adapting the shroud for cable entry from below ground Inst. 4–4. . . . . . . . . . . . . .
Adapting the shroud for cable entry from ground level Inst. 4–5. . . . . . . . . . . . . . .
Adapting the shroud for high level cable entry Inst. 4–6. . . . . . . . . . . . . . . . . . . . . .
Installation between cabinets (or the AEH) Inst. 4–7. . . . . . . . . . . . . . . . . . . . . . . . .
Cable routeing for multiple cabinet sites Inst. 4–10. . . . . . . . . . . . . . . . . . . . . . . . . . .
Chapter 5
Installing the auxiliary equipment housing i. . . . . . . . . . . . . . . . . . . . . .
Procedures for installing the auxiliary equipment housing Inst. 5–1. . . . . . . . . . . . . . . . .
Assumptions regarding site preparation Inst. 5–1. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Layout of the auxiliary equipment housing Inst. 5–1. . . . . . . . . . . . . . . . . . . . . . . . .
Auxiliary equipment housing packaging Inst. 5–2. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Introduction to installing the auxiliary equipment housing Inst. 5–2. . . . . . . . . . . . .
Installing the auxiliary equipment housing template Inst. 5–3. . . . . . . . . . . . . . . . . .
Installing auxiliary equipment housing bolt anchors Inst. 5–4. . . . . . . . . . . . . . . . . .
Bolting the auxiliary equipment housing to the floor Inst. 5–5. . . . . . . . . . . . . . . . .
Installing batteries in the auxiliary equipment housing Inst. 5–6. . . . . . . . . . . . . . . . . . . . .
Introduction to battery installation Inst. 5–6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Installing batteries Inst. 5–7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Auxiliary equipment housing (AEH) connections Inst. 5–10. . . . . . . . . . . . . . . . . . . . . . . . .
Earthing the AEH Inst. 5–10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Connecting dc cables to the AEH Inst. 5–10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Connecting the alarm signal cables Inst. 5–11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Internal connections in the AEH Inst. 5–11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Configuring battery backup to supply two BTS cabinets Inst. 5–12. . . . . . . . . . . . . . . . . . .
Introduction to configuring battery backup Inst. 5–12. . . . . . . . . . . . . . . . . . . . . . . . . .
Removing the power distribution box Inst. 5–12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Interior view of power distribution box Inst. 5–13. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Removing the parallelling links Inst. 5–14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Refitting the power distribution box Inst. 5–15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .