User's Manual Part 2

RFDS Setup and Calibration continued
PRELIMINARY
1X SCt4812ET Lite BTS Optimization/ATP
08/01/2001
3-84
Program TSU NAM
Follow the procedure in Table 3-46 to program the TSU NAM. The
NAM must be programmed before it can receive and process test calls,
or be used for any type of RFDS test.
Prerequisites
S MGLI is INS.
S TSU is powered up and has a code load.
Table 3-46: Program NAM Procedure
Step Action
1 Select the RFDS tab.
2 Select the TSU tab.
3 Click on the TSU menu.
4 Click on the Program TSU NAM menu item.
5 Enter the appropriate information in the boxes (see Table 3-40 and Table 3-41) .
6 Click on the OK button to display the status report.
7 Click on the OK button to close the status report window.
3