User's Manual Part 3

BTS Redundancy/Alarm Testing continued
Mar 2001
3-87
68P09253A61
SCt4812T CDMA BTS Optimization/ATP
DRAFT
Power Supply Redundancy
Follow the steps in Table 3-47 to verify redundancy of the power supply
modules. Alarms reported by the master GLI (displayed via the alarm
monitor) are also verified.
Table 3-47: Power Supply/Converter Redundancy (BTS Frame)
Step Action
1 Select the MGLI (highlight) and from the pulldown menu select:
Device>Set Redundant Sector>None/0
Device>Set Pilot>Only>Carrier#1-1
Device>Set Pilot>Only>Carrier#-1-1 and Pilot Gain = 262
2 Select (highlight) BBX1 and from the pulldown menu select Device>Key XCVR.
3 Set XCVR gain to 40 and enter the correct XCVR channel number.
4 Remove PS1 from the power distribution shelf (see Figure 3-19).
Observe that an alarm message is reported via the MGLI as displayed on the alarm monitor.
Verify no other modules went OOS.
5 Re-install PS1.
Observe the alarm clears on the alarm monitor.
6 Repeat steps 4 and 5 for PS2 and PS3.
NOTE
For +27 V systems, skip to step 7 through step 10.
7 On 48 V systems, remove PS4 (see Figure 3-20).
Observe that an alarm message is reported via the MGLI as displayed on the alarm monitor.
Verify no other modules went OOS.
8 Re-install PS4.
Observe the alarm clears on the alarm monitor.
9 Repeat steps 7 and 8 for PS5 through PS9.
10 Verify that all PWR/ALM LEDs are GREEN.
11 Select BBX-1 and Device>Dekey XCVR
3