User's Manual Part 3
Index – continued
DRAFT
SCt4812T CDMA BTS Optimization/ATP
Mar 2001Index-6
HP8935, I-7
Power Input, 6-13
Power Meter, 1-9
Power Meter Communication Failure,
Troubleshooting, 6-2
Power Supply Module Interface, 6-14
Pre–power tests, test data sheets, A-3
Preliminary operations
cell Site types, 2-1
test data sheets, A-2
Prepare to Leave the Site
external test equipment removal, 5-1
LMF Removal, 5-6
re–connect BTS IFM connector, 5-8
re–connect BTS T1 spans, 5-8
Reestablish OMC–R control, 5-8
Verify T1/E1, 5-8
Pushbuttons and Connectors, GLI2, 6-24
PWR/ALM LED
BBX, 6-25
CSM, 6-21
DC/DC Converter, 6-20
generic, 6-20
MCC, 6-25
R
RDM, 6-13
Re–connect BTS IFM connector, 5-8
Re–connect BTS T1 Spans, 5-8
Redundant GLIs, Enable, 3-31
Reestablish OMC–R control, 5-8
Reference Distribution Module, 6-13
Required documents, 1-12
RESET Pushbutton, GLI2, 6-24
Resetting BTS modules, 5-2
RF
Adapters, 1-10
Attenuators, 1-10
Load, 1-10
RF Path Calibration, 3-67
RFDS
Calibration, 3-82
DC Power Pre–test, 2-11
Description, 3-75
initial power–up, 2-14
Layout, 1-33
Parameter Settings, 3-76
Set Configuration Data, 3-81
rho, 4-5
rho test, 4-8
ROM Code, Download, H-1
RS–232 to GPIB Interface, 1-8
Rubidium Standard Timebase, 3-43
RX, antenna VSWR, test data sheets, A-17
RX Acceptance Tests, Frame Error Rate, 4-5, 4-12
RX path, 1-4
S
Sector Configuration, 1-28
Set Antenna Map Data, 3-80
Set Span Parameter Configuration, procedure, 5-4
Setting Cable Loss Values, 3-61
Setting TX Coupler Loss Value, 3-62
SGLI2, board detail, MMI port connections, 5-4
Shelf Configuration Switch, 2-3
Signal Generator, 3-58, 3-59
Site, equipage verification, 3-3
Site checklist, data sheets, A-2
Site equipage, CDF file, 3-2
Site I/O board, T1 span cable connection, 5-8
Site Serial Number Check List, A-18
Span Framing Format
configure, 5-4
verify, 5-3
Span I/O board
E1 span isolation, illustration, 3-5
T1 span isolation, illustration, 3-5
Span Line
connector , 6-13
T1/E1 Verification Equipment, 1-11
Span line traffic, No or missing, 6-16