User's Manual Part 3

Index continued
DRAFT
SCt4812T CDMA BTS Optimization/ATP
Mar 2001Index-4
Generating an ATP Report, 4-13
General optimization checklist, test data sheets, A-4
Gigatronics Power Meter, 3-43
GLI. See Master (MGLI2) and Slave (SGLI2) Group
Line Interface
GLI2
Connector, 6-14
Ethernet Connections, 6-14
LED Status, 6-23
No Control through span line connection, 6-15
No Control via LMF, 6-15
GPIB Cable, 1-9
GPS
Initialization/Verification, 3-36
receiver operation, test data sheets, A-5
satellite system, 3-30
Test Equipment Setup, 3-34
GPS Bad RX Message Type, 6-11
Graphical User Interface, 1-3, 3-18
GUI, 1-3, 3-18
Graphical User Interface, 3-18
Logging Out, 3-22
H
LMF Hardware Requirements, 1-7
High Stability 10 MHz Rubidium Standard, 1-11
High Stability Oscillator, 3-33
Highimpedance Conductive Wrist Strap, 1-10
HP 437B, 3-43
HP 83236 A, F-3
HP 83236A, F-2
HP 8921, 3-43
HP 8921A, System Connectivity Test, F-2
HP 8935, 3-43
HP PCS Interface Test Equipment Setup for Manual
Testing, F-7
HP Test Set, VSWR, G-2
HSO, Initialization/Verification, 3-42
HyperTerminal Connection, Creating, 3-10
I
I and Q values, B-1
InService Calibration, I-13
Initial Installation of Boards/Modules, preliminary
operations, 2-1
Initial power tests, test data sheets, A-3
Initial powerup
BTS frame, 2-14
RFDS, 2-14
Initialization/Verification
GPS, 3-36
HSO, 3-42
LFR, 3-39
Intended reader profile, 1-12
Interframe cabling, when to optimize, C-2
IS97 specification, B-1
ISB connectors, 6-13
Isolation, T1/E1 Span, 3-4
Itasca Alarms Test Box, 1-11
L
LAN
BTS frame interconnect, illustration, 3-14
Tester, 1-11
LAN Connectors, GLI2, 6-24
LED, CSM, 3-33
LED Status, 6-20
BBX, 6-25
CSM, 6-21
DC/DC Converter, 6-20
GLI2, 6-23
LPA, 6-26
MCC, 6-25
LFR
Initialization / Verification, 3-39
receiver operation, test data sheets, A-6
LFR/HSO, Test Equipment Setup, 3-34
Line Build Out parameters
configure, 5-4
verify, 5-3
LMF, 1-6, 3-7
Ethernet maintenance connector interface detail,
illustration, 3-6