User's Manual Part 3
FRU Optimization/ATP Test Matrix – continued
Mar 2001
C-3
SCt4812T CDMA BTS Optimization/ATP
DRAFT
If any significant change in signal level results from any
component being replaced in the RX or TX signal flow
paths, it would be identified by re–running the RX and TX
calibration audit command.
NOTE
When the CIO is replaced, the C–CCP shelf remains powered up. The
BBX boards may need to be removed, then re–installed into their
original slots, and re–downloaded (code and BLO data). RX and TX
calibration audits should then be performed.
. . . continued on next page
C