User's Manual Part 3
Prepare to Leave the Site – continued
Mar 2001
5-5
SCt4812T CDMA BTS Optimization/ATP
DRAFT
Table 5-4: BTS Span Parameter Configuration
Step Action
4 Repeat steps 1 through 3 for all remaining GLIs.
5 Exit the GLI MMI session and HyperTerminal connection by selecting File from the connection
window menu bar, and then Exit from the dropdown menu.
ÂÂÂÂÂÂÂ
ÂÂÂÂÂÂÂ
ÂÂÂÂÂÂÂ
ÂÂÂÂÂÂÂ
ÂÂÂÂÂÂÂ
Á
Á
Á
Á
Á
Á
Á
Á
FW00344
9–PIN TO 9– PIN
RS–232 CABLE
NULL MODEM BOARD
(PART# 8484877P01)
RS–232 CABLE
FROM LMF COM1
PORT
MMI SERIAL PORT
GLI BOARD
Figure 5-2: MGLI2/SGLI2 MMI Port Connection
Set BTS Site Span
Configuration
Perform the procedure in Table 5-5 to configure the Span Framing
Format and Line Build Out (LBO) parameters. ALL MGLI2/SGLI2
boards in all C–CCP shelves that terminate a T1/E1 span must be
configured.
Perform the following procedure ONLY if span
configurations loaded in the MGLI2/GLI2s do not match
those in the OMCR/CBSC data base, AND ONLY when the
exact configuration data is available. Loading incorrect
span configuration data will render the site inoperable.
IMPORTANT
*
5