Several procedures are required and are outlined in Table E-1 through
Table E-5.
Tools Needed
10 mm Nut Driver
TORX T15 Screw Driver
SMA torque wrench or 5/16 wrench if not available
Type N torque wrench or 11/16 wrench if not available.
Required documents
SC 4812ET RF and Power Cabinet Installation manual (Motorola
part number 68P64114A22).
SC 4812ET RF Cabinet Optimization/ATP manuals (Motorola part
number 68P64114A23 and 68P64114A42).
SC 614T 2nd Carrier Installation manual (Motorola part number
68P64114A07)
SC 614T 2nd Carrier Optimization/ATP manual (Motorola part
number 68P64113A61)
SC 614T Hardware Installation manual (Motorola part number
6864113A47).
Preparing the SC 614T
Table E-1 describes the procedures to prepare the SC 614T BTS for
side cable entry. Follow the procedure when new holes are required.
Side Cable Entry Hole Preparation
Table E-1: Side Cable Entry Hole Preparation
n Step Action
1 Determine the desired location for cable entry on the sides of the BTS below the side shrouds.
Figure E-1 can be used as a guideline. If a different pattern for cable entry is desired, use a hole
pattern that is more appropriate.
n WARNING
Safety Glasses are required for the following steps.
2 To punch the DoubleD holes for the type N connectors on the antenna cables, first drill a pilot
hole in the side wall of the BTS approximately 11 mm (7/16) in diameter. Use the DoubleD
punch CGDS50748149 to punch the DoubleD hole (see Figure E-2). Repeat as required.
3 To punch the round hole for the ground cable, AC power cable, etc., use a standard electrician hole
punch set. As with all tools, follow the safety instructions from the manufacturer of the tool. The
hole required for the ground wire bushing supplied is 23 mm (7/8).
4 If necessary use a deburring tool or sandpaper to remove any sharp burrs around the holes that
were punched.