User's Manual

Introduction
continued
Apr 2001
V02.03
15
SC
TM
4812ET RF and Power Cabinet Hardware Installation Manual
DRAFT
Chapter 4 Cabinet Mounting This chapter covers cabinet
preparation, rooftop (elevated) and concrete pad mounting, and battery
installation.
Chapter 5 Cabinet Cabling This chapter contains procedures for
cabling the RF and Power Cabinet. This includes earth ground, alarm &
span line, RGPS, RF GPS, LFR, RF, AC power, DC power, and other
cabling considerations.
Chapter 6 Whats Next and Cleanup This chapter includes site
cleanup and a preoptimization checklist.
Appendix A Installing RGPS”— This appendix covers the mounting
and installation of the RGPS hardware.
Appendix B Cabinet Specifications”— This appendix covers the
basic specifications of the SC 4812ET RF Cabinet and Power Cabinet.
Appendix C Installation Quickstart A quick reference quide to the
installation of the SC 4812ET BTS.
Appendix D SC 4812ET/SC 614 BTS DC Power Sharing This
appendix covers the instructions for powering both the SC 4812ET RF
Cabinet and the SC 614T BTS from one SC 4812ET Power Cabinet.
Appendix E SC 4812ET SC 614/SC 614T Companion Frame
Installation This appendix covers the instructions for converting the
existing SC 614T site from a starter frame to an expansion frame.
Appendix F SC 4812ET to SC 4812ET DC Power Sharing This
appendix covers the instructions for cabling a SC 4812ET Power
Cabinet to two 4812ET RF Cabinets.
Appendix G SC 4812ET SC 4812ET Companion Frame
Installation This appendix covers the instructions for connecting a
starter frame to an expansion frame.
Appendix H Installing RF GPS
Appendix I Minimum Requirements for Customer purchased CSU
Recommended
Documents
The following documents are recommended to perform the installation
of the cell site equipment:
S SC 4812ET CDMA Optimization (Motorola part number
68P09253A74)
S SC 4812ET Field Replaceable Unit (FRU) Identification Guide
(Motorola part number 68P09253A48)
1