Installation Instructions

Connector Locations – continued
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
6-4
Figure 6-3: Location of Primary Surge Suppressor Connectors
SITE I/O 2
AC POWER 2
AC POWER 3
AC POWER 4
AC POWER 1
AC INPUT
(Conduit Hole)
SITE I/O INPUT
(Conduit Hole)
SITE I/O 1
ANTENNA PROTECTOR 2
ANTENNA PROTECTOR 1
LEFT SIDE
RIGHT SIDE
GROUND 4
GROUND 3
GROUND 2
GROUND 1
EARTH
GROUND
ANTENNA PROTECTOR 3
(FOR FUTURE EXPANSION)
ANTENNA PROTECTOR 6
(FOR FUTURE EXPANSION)
ANTENNA PROTECTOR 5
(FOR FUTURE EXPANSION)
ANTENNA PROTECTOR 4
(FOR FUTURE EXPANSION)
6