Overview
The purpose of this procedure is to prepare the BTS for the ATP. This
procedure consists of:
1. Solar Cover Removal
2. BTS Power Up
3. Diagnostic Access Cover Removal
Tools Required
The following tools and materials are necessary to do this procedure:
S Torque driver wrench, 1/4–in. hex female drive, 0–10 N–M
S T20 Torx tamper bit
Remove Solar Cover
If you did not mount the solar cover during the unit installation, then this
procedure is not necessary.
Procedure
Remove the four captive screws (two on each side) that hold the front
solar cover. Refer to Figure 7-1.
Figure 7-1: Front Solar Cover (MicroCell Illustrated)
FRONT COVER
CAPTIVE SCREWS
CAPTIVE SCREWS
BTS Power Up
Figure 7-2 shows the location of the AC and DC Power breakers on the
Microcell unit. Both the AC and DC breakers must be pushed in to
power up the unit.