Installation Instructions

Installation Completion Checklist – continued
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
6-58
Installation completion
checklist
Date Hardware Installation Completed: ________________________
Site:_______________________________________________________
Serial Number(s):__________________________
__________________________________________________________
Checklist Completed By:_____________________________________
Checklist Reviewed By:______________________________________
Table 6-47: Installation Completion Checklist
Status No. Item Notes
1 Air flow clearance requirements are met.
2 Equipment is not damaged.
3 Mounting bracket is level and secure.
4 Back solar cover (if applicable) is securely
attached to the mounting bracket.
5 RGPS head and mast are secure.
6 RGPS head has a clear view of the sky and is
not in a location which accumulates debris.
Make sure the RGPS is located away from
the BTS transmit antenna.
7 Mounting bracket is connected to the Master
ground.
8 The connection to the AC source is secure (if
applicable).
9 The AC source is protected by a lightning
arrestor (if applicable).
10 The connection to the DC source is secure (if
applicable).
11 The connection to the battery is secure (if
applicable).
12 The connection to the auxiliary device is
secure (if applicable).
13 The antenna connections are secure.
14 The antenna cables are protected by lightning
arrestors (if applicable).
15 Customer input alarm connections are
complete between the Site I/O cable and the
Site I/O interface(s).
16 RGPS connections are complete between the
Site I/O cable and the Site I/O interface(s).
6