Installation Instructions
Terminating Unused Connections
DEC 2000
6-51
SCt300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Objective
The objective of this procedure is to terminate any unused connections.
Terminate all unused connections.
IMPORTANT
*
Termination List (MicroCell)
Table 6-43: Terminations of Unused Connectors
Connector Motorola Part # Description
AC Input 5887659C02 Terminator, AC
DC Input 5887659C04 Terminator, DC
MIB A 3009865S02 Terminator, MIB
SU Distribution 0187683C02 Terminator, SMA
MIB B, C 3009865S04 Cap, MIB
Termination List (PicoCell)
Table 6-44: Terminations of Unused Connectors
Connector Motorola Part # Description
AC Input 5887659C02 Terminator, AC
DC Input 5887659C04 Terminator, DC
MIB A, B, C 3009865S04 Cap, MIB
SU Distribution 0187683C01 Terminator, SMA
Procedure
The unit is shipped with the above terminators. Verify that a terminator
is on each unused connector. Tighten the SMA terminators using a
5/16 Breakaway 9 in. lb. Hand tighten all other terminators.
6