Installation Instructions
RF Path Audit – continued
DEC 2000
8-5
SCt300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Table 8-2: RF Path Audit
Step Action
1 Configure test equipment for TX path calibration according to NO TAG.
2 Select the MAWI. Select Tests>All Cal/Audit.
3 Type the appropriate channel number in the Carrier n Channels box.
4 Click OK.
5 Follow the cable connection directions as they are displayed. The test results will be displayed in the
status report window.
6 Click OK to close the status report widow.
8