Installation Instructions
TX & RX Acceptance Tests
DEC 2000
7-53
SCt300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
TX ATP Test
Refer to Table 7-29 to perform a TX ATP test. This procedure assumes
that the site specific CDF file is in the wlmf\cdma\bts–# folder.
The ALL TX list performs the following ATP tests:
1. TX Mask
2. Rho
3. Pilot Time Offset
4. Code Domain Power
Prerequisites
You must successfully complete all the procedures outlined in previous
chapters before you attempt to run an ATP.
Table 7-29: TX Acceptance Test Outline
Step Action
1 Set up test equipment for TX tests per Figure 7-17 or Figure 7-18.
2 Perform the following to run TX Acceptance Tests:
– Select the MAWI.
– Click on the Tests menu
– Select ALL TX.
* IMPORTANT
The DPLL must be tracking either GPS or HSO.
TX Tests Using Backup
Synchronization (Sites
Equipped With GPS)
Follow the steps in Table 7-30 to perform the TX test using backup
synchronization.
Table 7-30: TX Test Using Backup Synchronization
Step Action
1 If logged into the BTS with the LMF, then logout.
2 Open an MMI Communication session.
3 Verify that the BTS is in OOS_RAM status by entering the status command.
4 Simulate an LMF connection by entering the sndtype 0xa178 command.
. . . continued on next page
7