Installation Instructions
RF Path Audit
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
7-44
Test Equipment Setup
The BTS RF path is calibrated in the factory. There is no need to
calibrate during installation.
All tests are measured with respect to the Antenna output
connector. Additional losses must be compensated for. RF
calibration does not take the following into consideration:
– Antenna feedline losses.
– Antenna gain.
IMPORTANT
*
Transmit (TX) Audit
Prerequisites
The following steps must be completed before you do the TX RF path
audit.
1. MAWI has correct code load and data load.
2. MAWI is INS.
3. Test equipment and test cables are calibrated and connected to the
TX antenna outputs.
4. LMF is logged into the BTS.
Procedure
Follow the steps in Table 7-26 to audit the calibration.
To prevent damage to the test equipment all transmit (TX)
test connections must be via the 30 dB in-line attenuator
for the MicroCell BTS.
CAUTION
The TX audit actions can be performed separately by using
the applicable Device menu selections.
NOTE