Installation Instructions
Power Meter Calibration
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
7-38
Objective
This procedure calibrates the power meter that will be used for cable
calibration and BTS testing.
Prerequisites
The following are prerequisites for power meter calibration:
1. The power meter is connected. Refer to Figure 7-11 in the “Test
Equipment Selection” procedure.
2. Test equipment has been selected.
Procedure
Follow the steps in Table 7-23 to calibrate the power meter.
Table 7-23: Calibrate the Power Meter
Step Action
1 Click on Util>Calibrate Test Equipment. A cable connection direction pop–up is displayed.
2 Follow the directions provided.
3 Click on the OK button to close the status results window.
7