Installation Instructions
Test Equipment Setup – continued
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures
DEC 2000
7-36
Acceptance Test (ATP)
Equipment Setup
Follow the steps outlined in Table 7-21 to set up test equipment prior to
performing ATP tests.
LMF based measurements factor in cable and attenuator
loss between the BTS and test equipment. No additional
attenuation can be inserted as the additional losses would
not be factored in.
IMPORTANT
*
Table 7-21: Test Equipment Setup
Step Action
1 If you have not already done so, interface the CDMA LMF computer to the BTS and login to the BTS.
2 Refer to NO TAG to set up test equipment.
Verify that the coaxial cable from the appropriate TX connector on the BTS is connected to the test
equipment RF input port via the in line 30 dB high power attenuator for MicroCell BTSs.
7