User's Manual

Internal Assembly Location and Identification – continued
08/15/2000
1-21
SC 4812ETL BTS Optimization/ATP
PRELIMINARY
AC Load Center (ACLC)
The ACLC is the cabinet entry point for AC power. It incorporates AC
power distribution and surge protection (See Figure 1-3).
Figure 1-5: RF Interface Panel
A1 A2 A3 B1 B2 B3
SC48120004–1
Figure 1-6: RFDS and DRDC Details
BTS
CPLD
ANT
CPLD
DRDC
RFDS
SC48120005–1
1