User's Manual

Index – continued
08/15/2000
SC 4812ETL BTS Optimization/ATP
PRELIMINARY
Index-5
O
Online Help, 3-27
Optional test equipment, 1-10
10 MHz rubidium standard, 1-11
2–way splitter, 1-10
CDMA subscriber mobile or portable
radiotelephone, 1-10
duplexer, 1-10
frequency counter, 1-10
LAN tester, 1-10
oscilloscope, 1-10
RF circular, 1-11
RF test cable, 1-10
spectrum analyzer, 1-10
Oscilloscope, optional test equipment, 1-10
P
PCMCIA, Ethernet adapter
LMF to BTS connection, 3-20
remove from BTS, 5-4
Periodic optimization, 1-4
Pilot Time Offset. See PN
Pilot time offset, acceptance test, 4-13
Ping, 3-28
PN
offset programming information, E-1
offset usage, E-1
PN offset per sector, E-1
PN Offset Usage , E-1
Power Input, 6-14
Power Meter
illustration, F-17
Pre–calibration, F-17
Power meter
calibration, Gigatronics 8542B, F-19
illustration, Gigatronics 8542B, F-20
required test equipment, 1-8
TX acceptance tests, 4-3
Power Supply Module Interface, 6-14
Pre–calibration, Power Meter, F-17
Pre–power tests, test data sheets, A-3
Preliminary operations
cell Site types, 2-1
test data sheets, A-2
Prepare to leave site
connect BTS T1 spans, 5-5
remove external test equipment, 5-3
Prepare to leave the site
bringing modules into service, 5-3
download code and data from CBSC, 5-3
Prerequisites, automated acceptance tests, 4-2
Procedures to Copy CAL Files From Diskette to the
CBSC, 5-1, 6-2, 6-3, 6-4
Procedures to Copy Files to a Diskette, 5-1
Program, TSU NAM, 3-84
Pseudorandom Noise. See PN
Punch Block, 3-6
PWR/ALM and ACTIVE LEDs, MCC, 6-27
PWR/ALM LED
BBX2, 6-27
CSM, 6-23
DC/DC Converter, 6-22
generic, 6-22
MCC, 6-27
R
RAM code, described, 3-30
Report generation, ATP report, 4-20
Required test equipment
communications system analyzer, 1-6, 1-8
digital multimeter, 1-9
directional coupler, 1-9
Ethernet LAN transceiver, 1-7
GPIB cables, 1-8
high–impedance conductive wrist strap, 1-9
power meter, 1-8
RF adapters, 1-9
RF attenuator, 1-9
RF load, 1-9
RS232 to GPIB interface, 1-7
timing reference cables, 1-9
Required test equipment and software, list, 1-6
RESET Pushbutton, GLI, 6-26
RF
attenuator, 1-9
Circular – optional test equipment, 1-11
load for required test equipment, 1-9
required test equipment load, 1-9