RX FER Acceptance Test – continued
08/15/2000
4-19
SC 4812ETL BTS Optimization/ATP
PRELIMINARY
FER Acceptance Test
Follow the steps in Table 4-9 to verify the FER on all RX antenna paths
using all BBXs equipped at the BTS.
Table 4-9: Test FER
Step Action
1 Set up the test equipment for RX acceptance tests per Table 4-1.
2 Select the BBXs and MCCs to be tested.
3 From the Tests menu, select FER.
4 Select the appropriate carrier(s) (carrier-bts#-sector#-carrier#) displayed in the Channels/Carrier pick
list.
NOTE
To select multiple items, hold down the Shift or Ctrl key while making the selections.
5 Enter the appropriate channel number in the Carrier n Channels box.
6 From the RX Branch pick list, select the branch/branches to be tested.
7 Select the desired rate from the Rate Set pick list (1 = 9600, 2 = 14400).
8 Click OK. The status report window is displayed and a Directions pop-up is displayed.
9 Follow the cable connection directions as they are displayed. The test results are displayed in the
status report window.
10 Click Save Results or Dismiss.
NOTE
If Dismiss is used, the test results will not be saved in the test report file.