User Manual

Index – continued
July 1999
SC 4812ET BTS Optimization/ATP – CDMA LMF
PRELIMINARY 2
Index-3
transceiver, 1-6
Ethernet LAN links verification, 3-17
Ethernet maintenance connector interface, illustration,
3-8
F
fer test, 4-21
Files, calibration data file, BLO, 3-63
Folder Structure Overview, 3-11
Frame, equipage preliminary operations, 2-1
FREQ Monitor Connector, CSM, 5-23
Frequency counter, optional test equipment, 1-9
Front panel, LEDs, CSM, 3-29
Full Optimization Test, 4-8
G
Gain set point, C-1
General optimization checklist, test data sheets, A-4
GLI Connector, 5-14
GLI Ethernet A and B Connections, 5-14
GLI LED Status Combinations, 5-24
GLI Pushbuttons and Connectors, 5-25
GPIB Cables, 1-8
GPS, receiver operation, test data sheets, A-5
GPS Initialization/Verification
estimated position accuracy, 3-34
surveyed position accuracy, 3-34
GPS satellite system, 3-27
Graphical User Interface Overview , 3-19
H
Hardware Requirements, 1-5
High Stability 10 MHz Rubidium Standard, 1-10
High–impedance Conductive Wrist Strap, 1-9
HP8935 Analyzer, 1-8
HSO Initialization/Verification, 3-30
I
I and Q values, E-1, E-1
I/Q, PN initialization values for RF delay of 0, 13,
and 14 chips, E-3
Initial Installation of Boards/Modules, preliminary
operations, 2-1
Initial power tests, test data sheets, A-3
Installation and Update Procedures, 3-9
Inter–frame cabling, when to optimize, B-2
Intercabinet I/O, 1-15
IS–97 specification, E-1, E-1
ISB Inter Shelf Bus connectors, 5-13
L
LAN, BTS frame interconnect, illustration, 3-17
LAN Connectors (A & B), GLI, 5-25
LED, description front panel, CSM, 3-29
LED Status Combinations for all Modules except
GLI2 CSM BBX2 MCC24 MCC8E, 5-21
LFR, receiver operation, test data sheets, A-6
LMF
Ethernet maintenance connector interface detail,
illustration, 3-8
to BTS connection, 3-3, 3-7
view CDF information, 3-2
lmf Folder, 3-11
LMF Removal, 6-3
Loading Code, 3-24
loads folder, 3-13
Local Area Network (LAN) Tester, 1-9
Logging Out, 3-16
Logical BTS, 3-19
LORAN–C Initialization/Verification, 3-38
LPA Module LED, 5-27
LPA Shelf LED Status Combinations, 5-27
M
Manual, layout, 1-1
MASTER LED, GLI, 5-24
MCC LED Status Combinations, 5-26