User Manual
Index – continued
PRELIMINARY 2
SC 4812ET BTS Optimization/ATP – CDMA LMF
July 1999Index-2
Cannot communicate to Communications Analyzer,
5-3
Cannot communicate to Power Meter, 5-2
Cannot download CODE to any device card, 5-4
Cannot Download DATA to any device card, 5-4
Cannot ENABLE device, 5-5
Cannot load BLO, 5-7
Cannot Log into cell–site, 5-2
Cannot perform carrier measurement, 5-9
Cannot perform Code Domain Noise Power
measurement, 5-9
Cannot perform Rho or pilot time offset
measurement, 5-8
Cannot perform Txmask measurement, 5-8
cbsc folder, 3-13
CCP, shelf 1 – all inclusive TX ATP test outline,
primary, 4-3, 4-5, 4-7, 4-9, 4-23
CD ROM Installation, 3-9
CDF
site configuration, 3-1
site equipage verification, 3-2
site type and equipage data information, 2-1
CDMA, optimization/ATP test matrix, B-1
cdma Folder, 3-11
cdpower test, 4-18
Cell Site
equipage verification, 2-1
types configuration, 3-1
Cell Site Data File. See CDF
Cell Site Field Engineer CFE, 1-1
CIO Connectors, 5-14
Code Domain Power and Noise Floor Levels, 4-20
Code Domain Power ATP , 4-19
Code Domain Power test, 4-18
Code Domain Power/Noise, 4-18
code Folder, 3-14
Communications System Analyzer, 1-7
Communications system analyzer , 1-7, 1-8
Connecting test equipment to the BTS, 3-40
Connector Functionality
Backplane, Troubleshooting, 5-13
Troubleshooting, Backplane, 5-13
Copying CAL files from CDMA LMF to the CBSC,
3-10, 6-1
Copying CAL files to the CBSC, 3-10, 6-2
CSM, and LFR primary functions, 3-29
CSM frequency verification, 3-30
CSM LED Status Combinations, 5-22
CyberTest Communication Analyzer, 1-8
D
data Folder, 3-15
DC Distribution Pre–test, BTS frame detail, 2-16
DC Power Problems, C–CCP Backplane
Troubleshooting, 5-19
DC/DC Converter LED Status Combinations, 5-21
Selecting Devices, 3-20
Detailed, optimization/ATP test matrix, B-2
Digital Control Problems, 5-15
C–CCP Backplane Troubleshooting, 5-15
Digital Multimeter, 1-8
DIP switch settings, 2-2
Directional Coupler, 1-8
Download, BTS system software, 3-2
Download BDCs, 3-25
Download BLO Procedure, 3-67
Download/Enable MCCs, 3-28
Download/Enable MGLIs, 3-24
E
E1, isolate BTS from the E1 spans, 3-3
Enable CSMs & BDCs, 3-26
Enabling Devices, 3-21
Equipment, warm–up, CSM/LFR tests, 3-30
Equipment setup, VSWR
Advantest Test Set, 3-82
HP Test Set, 3-80
Equipment warm-up, 3-42
Ethernet LAN
interconnect diagram, 3-17