User Manual
July 1999
SC 4812ET BTS Optimization/ATP – CDMA LMF
PRELIMINARY 2
Index-1
Index
Numbers
10BaseT/10Base2 Converter, 1-6
10BaseT/10Base2 converter, LMF to BTS
connection, 3-7
2–way Splitter, 1-10
A
Abbreviated
RX acceptance test, all–inclusive, 4-2
TX acceptance test, all–inclusive, 4-2
Acceptance Test Procedures ATP , 1-1
ACTIVE LED
GLI, 5-24
MCC, 5-26
ALARM LED, GLI, 5-24
Alarm Monitor window, 2-8
Alarm Reporting Display, 2-8
Alarm Test Box, 1-10
All inclusive, TX ATP test outline – CCP shelf 1,
primary, 4-3, 4-5, 4-7, 4-9, 4-23
Ancillary Equipment Frame identification, 1-17
Ancillary frame, when to optimize, B-1
ATP
all inclusive TX acceptance test outline, 4-2
generate failure report, 4-23
generate report, 4-23
test matrix/detailed optimization, B-2
ATP – Code Domain Power, 4-18
ATP – Frame Error Rate (FER), 4-21
ATP – Pilot Time Offset, 4-16
ATP – Spectral Purity Transmit Mask, 4-11
ATP – Waveform Quality (rho), 4-14
ATP Report, 4-23
B
Backplane DIP switch settings, 2-2
Basic Troubleshooting Overview, 5-1
Bay Level offset calibration failure, 5-6
BBX, gain set point vs SIF output considerations, C-1
BBX2 Connector, 5-14
BBX2 LED Status Combinations, 5-26
BTS
Ethernet LAN interconnect diagram, 3-17
LMF connection, 3-7
system software download, 3-2
when to optimize, B-1
BTS frame, DC Distribution Pre–test, 2-16
BTS Log In Procedure, 3-16
BTS Site Setup for Acceptance Test Procedures, 3-22,
3-70, 4-17, 4-19, 4-22
Create CAL File, 3-71
bts–nnn Folders, 3-12
bts–nnn.cal File, 3-12
C
C–CCP Backplane Troubleshooting, Procedure, 5-14
C–CCP Shelf, 1-12
Calibrating Cables, 3-55
Calibrating Test Equipment, 3-55
Calibration, data file calibration, BLO, 3-63
Calibration Audit failure, 5-7
calibration data file, description of, BLO, 3-63