User Manual
CCP Backplane Troubleshooting – continued
PRELIMINARY 2
SC 4812ET BTS Optimization/ATP – CDMA LMF
July 1999
5-16
No GLI2 Control through Span Line Connection (All GLI2s)
Table 5-16: No GLI2 Control through Span Line Connection (Both
GLI2s)
Step Action
1 Verify C–CCP backplane Shelf ID DIP switch is set correctly.
2 Verify that the BTS and GLI2s are correctly configured in the
OMCR/CBSC data base.
3 Visually check the master GLI2 connector (both board and
backplane) for damage.
4 Replace the master GLI2 with a known good GLI2.
5 Check the span line inputs from the top of the frame to the
master GLI2 for proper connection and damage.
Table 5-17: MGLI2 Control Good – No Control over Co–located
GLI2
Step Action
1 Verify that the BTS and GLI2s are correctly configured in the
OMCR CBSC data base.
2 Check the ethernet for proper connection, damage, shorts, or
opens (refer to the page 3-18 of this manual).
3 Check the appropriate ISB cables connectors and ISB
backplane connectors for proper connection and damage.
4 Visually check all GLI2 connectors (both board and
backplane) for damage.
5 Replace the remaining GLI2 with a known good GLI2.
6 Verify ISB terminations are installed. Check connectors (both
cable and backplane) for damage. Replace the ISB cable with
a known good cable.
NOTE
Externally route the cable to bypass suspect segment.
5