Troubleshooting: Download – continued
July 1999
5-5
SC 4812ET BTS Optimization/ATP – CDMA LMF
PRELIMINARY 2
Cannot ENABLE Device
Table 5-6: Troubleshooting Device Enable (INS) Failure
Step Action
1 Re-seat card and repeat code and data load procedure.
2 If CSM cannot be enabled, verify the CDF file has correct latitude and longitude
data for cell site location and GPS sync.
3 Ensure primary CSM is in INS_ACT state.
NOTE
MCCs will not go INS without the CSM and the BDC being INS.
4 Verify 19.6608 MHz CSM clock; MCCs will not go INS otherwise.
5 The BBX should not be enabled for ATP tests.
6 If MCCs give “invalid or no system time,” verify the BDC is enabled. If error
persists, verify the CSM is enabled.
Miscellaneous Errors
Table 5-7: Miscellaneous Failures
Step Action
1 If LPAs continue to give alarms, even after cycling power at the circuit breakers,
then connect an MMI cable to the LPA and set up a Hyperterminal connection.
Enter
ALARMS in the Hyperterminal window. The resulting LMF display may
provide an indication of the problem. (Call Field Support for further assistance.)