User Manual

TX Spectral Purity Transmit Mask Acceptance Test – continued
PRELIMINARY 2
SC 4812ET BTS Optimization/ATP – CDMA LMF
July 1999
4-12
Prerequisites
Before attempting to run any ATP tests, ensure the following have been
completed:
CSMs, GLI2s, BBX2s, and MCCs have correct code load and data
load.
Primary CSM, GLI2, and MCCs are INS.
BTS has been optimizes/calibrated per Chapters 2 and 3.
BBX2s are OOS–RAM.
Test equipment is connected for ATP tests (see Figure 3-16 through
Figure 3-19).
Test equipment is warmed up 60 minutes and calibrated.
Test cables are calibrated.
GPIB is on.
LMF is logged into the BTS.
TX Mask Test Procedure
Follow the steps in Table 4-5 to verify the transmit spectral mask
specification on all TX antenna paths using all BBX2s equipped at the BTS.
Table 4-5: TX Mask ATP
Step Action
1 Select the BBX2(s) to be tested.
2 From the Tests menu, select TX Mask.
3 Select the appropriate carrier(s) (carrier – bts# –sector# –carrier#) displayed in the
Channels/Carrier pick list (use the Shift or Ctrl keyboard key to select multiple items).
4 Type the appropriate channel number in the Carrier n Channels box and click OK.
5 Follow the cable connection directions as they are displayed.
6 Click on OK to close the status report window.
NOTE
The communications test set will measure and return the attenuation level of all spurious and IM
products in a 30 kHz resolution bandwidth, with respect to the mean power of the CDMA channel,
measured in a 1.23 MHz bandwidth.
4