Product Info
Break er Module Assembly (BMA) Chapter 9: PDU R eplacement Procedures
Prior to replacing a BMA, the UBS Macro BTS site signaling is shutdown (i.e., disable the BTS
site) then the UBS Macro BTS frame is powered down.
Table 9 -3 PDU R eplacement Conditions
FRU
Ref Designator What to Shutdown...
Breaker Module
Assembly (BMA)
XMI 1 – XMI 4, DMI
1 – DMI 5, S SI 1 –
S SI 2, ACC 1 – ACC
2
Shutdown site signaling functions and then power
down the frame.
Required items
Documents
•
1X UBS Macro BTS Optimization/A TP
manual.
Tools
• T orque driver
• T25 TORX driver
Torque requirements
• BMA mounting screws; 4.8 N -m (42.25 in -lb) ±10%
Replacement unit
• 90A BMA (Motorola model STLN4093), for XMIs
• 20A BMA (Motorola model STLN6472), for DMIs and S SIs
• 10A BMA (Motorola model STLN6475), for ACCs
Mounting screws are provided with each BMA; four screws with the 90A BMA,
two screws with the 20A BMA and two screws with the 10A BMA.
9 -8 68P09283A64 -3
FOA SEP 2007