Product Info
Modem Boards Chapter 8: DMI R eplacement Procedures
• BTS Device Database Audit
• BTS Device Database Update
• Timing Initialization/V erification
• TX P ath Calibration Audit
• Spectral Purity TX Mask A TP (optional)
• W aveform Quality (Rho) A TP (optional)
• Code Domain P ower A TP (optional)
• FER T est
• Alarm V erification
Refer to the
1X UBS Macro BTS Optimization/A TP
manual for the optimization procedures.
8 -30 68P09283A64 -3
FOA SEP 2007