Installation Manual
Table Of Contents
- 12.1_IHET5JX1_install_manual_cover.pdf
- HW-Inst-68P09283A62-3,_PRELIMINARY
- R20 1X UBS Macro BTS Hardware Installation
- Contents
- List of Figures
- List of Tables
- About This Manual
- Revision history
- General information
- Contacting Motorola
- Security advice
- Warnings, cautions, and notes
- Safety
- Caring for the environment
- CMM labeling and disclosure table
- Motorola document set
- Third Party Computer Software and Trademarks
- Chapter 1: Introduction and Frame Identification
- Unpacking Instructions
- Tools and materials
- Item identification
- UBS Macro BTS frames
- Figure 1-1 UBS Macro BTS low-tier/low-capacity frame (1000 mm ra
- Figure 1-2 Low capacity UBS Macro BTS starter frame (1800 mm rac
- Figure 1-3 UBS Macro BTS mid-capacity frame (1800 mm rack)
- Figure 1-4 High capacity 800 MHz UBS Macro BTS fully expanded fr
- Figure 1-5 High-capacity 1.9 GHz UBS Macro BTS fully expanded fr
- Items to be installed
- UBS Macro BTS frames
- Overview
- Scope of manual
- Prerequisites
- Chapter 1 - Introduction and frame identification
- Chapter 2 – UBS Macro BTS installation procedure
- Chapter 3 - Low-to-Mid Capacity Frame Expansion Procedures
- Chapter 4 - What’s next
- Equipment shipped assembled
- Equipment shipped un-assembled
- Follow the task sequence
- Follow the site plan
- Site cleanliness
- Site manager
- Color coding
- Rack vs. frame
- Required documentation
- Equipment may vary from figures
- Abbreviations and Acronyms
- Chapter 2: UBS Macro BTS Installation Procedure
- Overview
- Cable list, diagrams and connectors
- Full installation sequence
- Site verification
- Task 1: Installing RGPS Head
- Tasks 2-3: Installing Rack & Ground Cable
- Task 4: Rack Mounting the Optional PSM Shelf
- Task 5: Rack Mounting for Low-Capacity Frame
- Task 6: Expanding the Low-capacity Frame
- Task 7: Cabling the Optional PSM Shelf
- Tasks 8-9: Connecting TX/RX Antennas
- Tasks 10-13: Connecting RGPS, Spans, Customer Alarms
- Task 14: Connecting +27 V DC Power
- Task 15: Connecting -48 V DC Power
- Task 16: Connecting 220 V AC Power
- Chapter 3: Low-to-Mid Capacity Frame Expansion
- Low-to-Mid Capacity Frame Expansion Overview
- Adding Circuit Breakers/Connectors to PDU
- Adding an XMI
- Adding a DMI
- Adding a Second Set of IDRFs
- Adding an Optional RX Splitter
- Adding a third PSM (–48 V or 220 V AC only)
- Mid-capacity Expansion Interconnect Cabling
- Chapter 4: What’s Next
- R20 1X UBS Macro BTS Hardware Installation
R20 1X UBS Macro B T S Hardw are Installation T ask 1: Installing RGPS Head
Figure 2 -8 RGPS lightning arrestor wiring
ti-cdma-06007.eps
Blue/Blac k
Blue
Green/Blac k
Green
White/Black
White
Red /Blac k
Yellow
/Black
Yellow
Red
Brown/Blac k
Brown
Cab le Drain
Blue/Blac k
Blue
Green/B lac k
Green
White/Black
White
Red/Blac k
Red
Brown/Black
Brown
Cable Drain
+40V
DC
Line s +17V
D
C
Li
n
es +1
7
V
DC
Line s
+17V
D
C
Equipm e n t+17V
D
C
Equi
p
me nt+ 40V
DC
Equipm e n
t
NO TE
NN (RGPS )
TO RGPS
ANTENNA
EARTH GROUN D
MOUNTING PL ATE
Blue/Blac k
Blue
Yellow/Black
Yellow
Green/B lac k
Green
White/Blac k
White
Red/Blac k
Red
Brown/Black
Brown
1
2
3
4
5
6
7
8
9
10
11
12
No Connection No Connec tion
Wh e n th e lig h tn in g a rre s to r is
p ro p e rly wire d, th e c o lo r o f th e wire
a tta ch e d to e a c h "Eq u ip m e nt" s c re w
te rm in a l s ho u ld m a tch th e c o lo r o f
th e wire a tta ch e d to th e c o rre s p o n d -
ing "Line s " s c re w te rm in a l.
AA (RGP S)
TO BTS
C AUTIO N !
All lig h tn ing a rre s to r wire c o n n e c tion s
s ho u ld b e th oro u g h ly in s p e cte d for inte g rity
a nd a cc u ra cy. Ve rify th a t th e c o n n e c tio n s
a re e xa c tly a s s h o wn in th is d ia g ra m.
P rob le ms d u e to wirin g e rro rs c a n ra n g e
from im p ro p e r BTS o p e ra tio n to p e rm a n e nt
d a m a ge to th e R G P S h e a d. Th e o p e ra tio n a l
p ro b le m s m a y n o t b e e a s ily d e te c ta b le .
Yellow/Black
Yellow
Mounting diagrams
Figure 2 -9 and Figure 2 -10 show the mounting details for the RGPS heads.
68P09283A62 -3 2 -23
PRELIMINARY A UG 2007