Overview
Scope of manual
This manual covers how to:
Mount the equipment rack to the floor .
Mount the pre -assembled/pre -cabled UBS Macro equipment on to the rack.
Mount the optional power supply equipment on to the rack and install all of the associated
interconnect cabling.
Mount the low -to -mid capacity expansion equipment on to the rack and install all of the
associated interconnect cabling.
Install external cabling and wiring between the rack mounted UBS Macro equipment and
other BTS site equipment.
This manual is not intended to be used as a planning guide. All site plans and site specific
information must be decided, before starting the installation. The site specific information
determines the configuration to be used and the items and cabling required to support that
configuration.
This manual may be used in conjunction with site -specific configuration planning to determine
the site -specific expansion.
This manual does not provide information for the Acceptance T est Procedures (A TP) or software
loading.
Prerequisites
The following are the three major prerequisites:
The procedure, tools, and equipment required for mounting the rack to the floor has
been specified by a Structural Engineer .
All site preparations (including power) have been completed according to the site plan.
All site planning and BTS configuration information is available.
Chapter 1 - Introduction and frame identication
This chapter provides a brief description of the information presented in the manual, frame
identification information, installation sequence, and a list of tools.
68P09283A62 -3 1 -5
PRELIMINARY A UG 2007