Installation Manual
Table Of Contents
- 12.1_IHET5JX1_install_manual_cover.pdf
- HW-Inst-68P09283A62-3,_PRELIMINARY
- R20 1X UBS Macro BTS Hardware Installation
- Contents
- List of Figures
- List of Tables
- About This Manual
- Revision history
- General information
- Contacting Motorola
- Security advice
- Warnings, cautions, and notes
- Safety
- Caring for the environment
- CMM labeling and disclosure table
- Motorola document set
- Third Party Computer Software and Trademarks
- Chapter 1: Introduction and Frame Identification
- Unpacking Instructions
- Tools and materials
- Item identification
- UBS Macro BTS frames
- Figure 1-1 UBS Macro BTS low-tier/low-capacity frame (1000 mm ra
- Figure 1-2 Low capacity UBS Macro BTS starter frame (1800 mm rac
- Figure 1-3 UBS Macro BTS mid-capacity frame (1800 mm rack)
- Figure 1-4 High capacity 800 MHz UBS Macro BTS fully expanded fr
- Figure 1-5 High-capacity 1.9 GHz UBS Macro BTS fully expanded fr
- Items to be installed
- UBS Macro BTS frames
- Overview
- Scope of manual
- Prerequisites
- Chapter 1 - Introduction and frame identification
- Chapter 2 – UBS Macro BTS installation procedure
- Chapter 3 - Low-to-Mid Capacity Frame Expansion Procedures
- Chapter 4 - What’s next
- Equipment shipped assembled
- Equipment shipped un-assembled
- Follow the task sequence
- Follow the site plan
- Site cleanliness
- Site manager
- Color coding
- Rack vs. frame
- Required documentation
- Equipment may vary from figures
- Abbreviations and Acronyms
- Chapter 2: UBS Macro BTS Installation Procedure
- Overview
- Cable list, diagrams and connectors
- Full installation sequence
- Site verification
- Task 1: Installing RGPS Head
- Tasks 2-3: Installing Rack & Ground Cable
- Task 4: Rack Mounting the Optional PSM Shelf
- Task 5: Rack Mounting for Low-Capacity Frame
- Task 6: Expanding the Low-capacity Frame
- Task 7: Cabling the Optional PSM Shelf
- Tasks 8-9: Connecting TX/RX Antennas
- Tasks 10-13: Connecting RGPS, Spans, Customer Alarms
- Task 14: Connecting +27 V DC Power
- Task 15: Connecting -48 V DC Power
- Task 16: Connecting 220 V AC Power
- Chapter 3: Low-to-Mid Capacity Frame Expansion
- Low-to-Mid Capacity Frame Expansion Overview
- Adding Circuit Breakers/Connectors to PDU
- Adding an XMI
- Adding a DMI
- Adding a Second Set of IDRFs
- Adding an Optional RX Splitter
- Adding a third PSM (–48 V or 220 V AC only)
- Mid-capacity Expansion Interconnect Cabling
- Chapter 4: What’s Next
- R20 1X UBS Macro BTS Hardware Installation
Securit y advice
Security advice
■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
■
■
Motorola systems and equipment provide security parameters that can be configured by the
operator based on their particular operating environment. Motorola recommends setting and
using these parameters following industry recognized security practices. Security aspects
to be considered are protecting the confidentiality , integrity , and availability of information
and assets. Assets include the ability to communicate, information about the nature of the
communications, and information about the parties involved.
In certain instances, Motorola makes specific recommendations regarding security practices.
The implementation of these recommendations and final responsibility for the security of the
system lies with the operator of the system.
Contact the Customer Network Resolution Center (CNRC) for assistance. The 24–hour
telephone numbers are listed at https://mynetworksupport.motorola.com . Select Customer
Network Resolution Center contact information , from the menu located to the left of the
Login box. Alternatively if you do not have access to CNRC or the internet, contact the Local
Motorola Office.
68P09283A62 -3 7
A UG 2007 PRELIMINARY