Installation Manual
Table Of Contents
- 12.1_IHET5JX1_install_manual_cover.pdf
- HW-Inst-68P09283A62-3,_PRELIMINARY
- R20 1X UBS Macro BTS Hardware Installation
- Contents
- List of Figures
- List of Tables
- About This Manual
- Revision history
- General information
- Contacting Motorola
- Security advice
- Warnings, cautions, and notes
- Safety
- Caring for the environment
- CMM labeling and disclosure table
- Motorola document set
- Third Party Computer Software and Trademarks
- Chapter 1: Introduction and Frame Identification
- Unpacking Instructions
- Tools and materials
- Item identification
- UBS Macro BTS frames
- Figure 1-1 UBS Macro BTS low-tier/low-capacity frame (1000 mm ra
- Figure 1-2 Low capacity UBS Macro BTS starter frame (1800 mm rac
- Figure 1-3 UBS Macro BTS mid-capacity frame (1800 mm rack)
- Figure 1-4 High capacity 800 MHz UBS Macro BTS fully expanded fr
- Figure 1-5 High-capacity 1.9 GHz UBS Macro BTS fully expanded fr
- Items to be installed
- UBS Macro BTS frames
- Overview
- Scope of manual
- Prerequisites
- Chapter 1 - Introduction and frame identification
- Chapter 2 – UBS Macro BTS installation procedure
- Chapter 3 - Low-to-Mid Capacity Frame Expansion Procedures
- Chapter 4 - What’s next
- Equipment shipped assembled
- Equipment shipped un-assembled
- Follow the task sequence
- Follow the site plan
- Site cleanliness
- Site manager
- Color coding
- Rack vs. frame
- Required documentation
- Equipment may vary from figures
- Abbreviations and Acronyms
- Chapter 2: UBS Macro BTS Installation Procedure
- Overview
- Cable list, diagrams and connectors
- Full installation sequence
- Site verification
- Task 1: Installing RGPS Head
- Tasks 2-3: Installing Rack & Ground Cable
- Task 4: Rack Mounting the Optional PSM Shelf
- Task 5: Rack Mounting for Low-Capacity Frame
- Task 6: Expanding the Low-capacity Frame
- Task 7: Cabling the Optional PSM Shelf
- Tasks 8-9: Connecting TX/RX Antennas
- Tasks 10-13: Connecting RGPS, Spans, Customer Alarms
- Task 14: Connecting +27 V DC Power
- Task 15: Connecting -48 V DC Power
- Task 16: Connecting 220 V AC Power
- Chapter 3: Low-to-Mid Capacity Frame Expansion
- Low-to-Mid Capacity Frame Expansion Overview
- Adding Circuit Breakers/Connectors to PDU
- Adding an XMI
- Adding a DMI
- Adding a Second Set of IDRFs
- Adding an Optional RX Splitter
- Adding a third PSM (–48 V or 220 V AC only)
- Mid-capacity Expansion Interconnect Cabling
- Chapter 4: What’s Next
- R20 1X UBS Macro BTS Hardware Installation
Installation completion Chapter 4: What ’ s Next
Table 4 -1 Installation completion checklist (Continued)
Status
No. Item Notes
13
Cable racks properly grounded.
14 Static wrist straps are present.
15
Site cleaned, swept, and trash removed.
16
Any deficiencies reported to the
appropriate people.
17
Correct polarity has been maintained
from the DC power source to the frame.
18
P ower has not been applied to any frame.
Record “As -Built” information
Record the site specific information on how the unit was installed and cabled.
Performing the ATPs
This manual does not cover the procedure of performing the A TP s. F or this procedure, refer to
the
1X UBS Macro BTS Optimization/A TP
(68P09283A63) manual.
Loading the software
This manual does not cover the procedure for loading the software. Refer to the appropriate
software release manual for procedure for loading the software.
4 -4 68P09283A62 -3
PRELIMINARY A UG 2007